PLOTTING THE OUTLINE OF THE GIVEN BUILDING-CROSS STAFF SURVEY
Aim:-
To plot the plan of an existing building by running a closed chain traverse and to find the
area of the plot.
Instruments Required:-
Chain, Cross staff, optical square, ranging rods, arrow & tape.
Procedure:-
1. Range and chain the lines around the given building to form a rectangle in clockwise/anti
clockwise direction.
2. Measure all the offset points (Perpendicular/ Oblique) from the chain line.
3. Plot the building in a drawing sheet with suitable scale.
4. Subtract the un-built up area (open space) of the plot from the total area of the plot to find
the built up area of the building.
No comments:
Post a Comment